SHOTCRETE RED HOT IN PERU
Extract from Shotcrete Magazine, August 2000

Antamina copper mine is a $2.2 billion project in the Andes Mountains of Peru. The project, owned by Canadian mining giants Noranda, Teck and Rio Algom, is one of the single largest mining investments in the Americas at this moment and comprises the construction of an open pit, a conveyor tunnel, a tailings dam, a mill and port facilities for export of processed concentrate all over the globe. 

The entire project is based on the highest world standards of safety, environmental protection and construction quality, with general construction management being done by Bechtel of the USA in joint venture with Cosapi of Peru. Amongst the various infrastructure needed is a decant tunnel to take the possible overflow from the tailings dam to a conversion route. This tunnel happened to be in the critical path of the entire project and therefore required strict tolerances for time of completion. This tunnel, designed by Golder Associates' Vancouver office in association with Ingetec of Columbia was awarded to Redpath Mas Errazuriz Peru (RME Peru), a tunnel contracting joint venture of Redpath of Canada and Mas Errazuriz of Chile. It was designed to be shotcreted during excavation with different shotcrete thicknesses according to ground conditions.

It was RME Peru's decision to contract out the shotcrete supply to Target Products of Canada. The main factors for this decision were:

    High shotcrete quality standards imposed by the client

    Shotcrete supplier's guaranteed shotcrete delivery

    Ability to deal with a single supplier for all shotcrete related matters rather than several suppliers (cement, aggregates, admixtures, fibers, mixing equipment, etc.)

    Less supply items to manage on site (stock only shotcrete rather than cement, admixtures, etc.)

    Less equipment on site, where problems are difficult and costly to solve

    Less manpower on site, lower boarding and transportation costs

    Gain in construction speed by having shotcrete always available on site

    Access to state-of-the-art personnel and expertise from supplier's staff

Target Products is proud to announce that in order to supply the project, we created an association with La Viga of Peru and met the challenge of initiating supply only one week after signing of the contract with RME Peru.

Click here to view a Target Products Client list of Major Mining and Tunnelling Projects

 

 

Engineering | FacilitiesFuture | Golf  | MiningNew | Products 

| Home

Maintained by the Web Committee: Web@TargetProducts.com 

© Copyright 2007 Target Products Ltd. All Rights Reserved

TARGET is a registered trade-mark of Tegrat Holdings Ltd. Target Products Ltd. is an authorized licensee.