Dry-Shotcrete Production at Kemano Plant, Kitimat (BC)
|
Project:
|
Intake and exhaust tunnels and
powerhouse for the KEMANO Hydroelectric Plant (near Kitimat, BC)
|
|
Year:
|
1990/1991
|
|
Owner:
|
Alcan - K.C.P. (Kemano Completion
Project)
|
|
Contractor:
|
Foundation
|
|
Client:
|
Foundation
|
|
Volume:
|
Approximately 6,000 yd3
in 200 days
|
|
Operation:
|
Target Products Limited designed,
built and operated its own batch plant which was erected at the site.
-
Shotcrete Concentrate (a mixture of
cement and all necessary admixtures) was brought to site in pre-dosed
bulk bags.
-
Gravel and sand available on site
were dried and sieved to attain a recommended ACI No2
shotcrete gradation.
-
Dry shotcrete was available to the
contractor at all times from a 50 cubic yard silo erected just outside
the mine.
-
Shotcrete was taken into the mine in
auger trucks operated by the contractor - trucks were gravity loaded
at the silo in less than 15 minutes.
-
The shotcrete plant was fully
operational only 7 weeks after placing of the order.
|



Figure 5
- Schematic plan view of the KEMANO plant.
|