On-Site Dry-Shotcrete Production at Kemano Plant, Kitimat (BC)

Project:

Intake and exhaust tunnels and powerhouse for the KEMANO Hydroelectric Plant (near Kitimat, BC)

Year:

1990/1991

Owner:

Alcan - K.C.P. (Kemano Completion Project)

Contractor:

Foundation

Client:

Foundation

Volume:

Approximately 6,000 yd3 in 200 days

Operation:

Target Products Limited designed, built and operated its own batch plant which was erected at the site.  

  • Shotcrete Concentrate (a mixture of cement and all necessary admixtures) was brought to site in pre-dosed bulk bags.

  • Gravel and sand available on site were dried and sieved to attain a recommended ACI No2 shotcrete gradation.

  • Dry shotcrete was available to the contractor at all times from a 50 cubic yard silo erected just outside the mine.

  • Shotcrete was taken into the mine in auger trucks operated by the contractor - trucks were gravity loaded at the silo in less than 15 minutes.

  • The shotcrete plant was fully operational only 7 weeks after placing of the order.

 


 

 Figure 5 - Schematic plan view of the KEMANO plant.

 

Engineering | FacilitiesFuture | Golf  | MiningNew | Products 

| Home

Maintained by the Web Committee: Web@TargetProducts.com 

© Copyright 2010 Target Products Ltd. All Rights Reserved

TARGET is a registered trade-mark of Quikrete Canada Holdings, Limited. Target Products Ltd. is an authorized licensee.

TARGET PRODUCTS LTD. is a wholly-owned subsidiary of the QUIKRETE® Companies